Follow us on:

Twitter YouTube

Contact us

Contact us

Email updates?

Email updates?

Tools:

Send to
friends:

Send to friends

 

Print:

Print

 

Text size:

Text Size - Small Text Size - Normal Text Size - Large

Maps


For an up-to-date map of the project please visit the Planning Inspectorate’s website.

The maps below show the project at previous stages of development.

Stage 4

Southwick consultation overview map

Section A: Puriton Ridge

Section B: Somerset Levels and Moors South

Section C: Mendip Hills

Section D: Somerset Levels and Moors North

Section E: Tickenham Ridge

Section F: Portishead

Section G: Avonmouth

Section H: Hinkley line entries

Section I: Aust Substation

The local electricity network

Stage 3 

Autumn 2012 – The draft route

Draft route overview map

Draft route Study Area A map

Draft route Study Area B map

Draft route Study Area C map

Draft route Study Area D map

Draft route Study Area E map

Draft route Study Area F map

Draft route Study Area G map

Draft route Aust Study Area map

Draft route Hinkley line entries Study Area map

Local electricity network map

Local Community Forum map North

Local Community Forum map Mendip

Local Community Forum map South

Gazetteer to accompany the Local Community Forum maps

Environmental maps

Ecology

Combined Designation Sheets and Inset Map Part 1

Combined Designation Sheets and Inset Map Part 2

Combined Designation Sheets and Inset Map Part 3

Combined otter and water vole Sheets and Inset Map Part 1

Combined otter and water vole Sheets and Inset Map Part 2

Combined reptile Sheets and Inset Map Part 1

Combined reptile Sheets and Inset Map Part 2

Combined amphibians Sheets and Inset Map

Combined dormouse Sheets and Inset Map

Combined Phase 1 Sheets and Inset Map Part 1

Combined Phase 1 Sheets and Inset Map Part 2

Combined Phase 1 Sheets and Inset Map Part 3

Historic Environment

Historic Landscape Character

Historic Environment Records – Study Area A

Historic Environment Records – Study Area B Part 1

Historic Environment Records – Study Area B Part 2

Historic Environment Records – Study Area B Part 3

Historic Environment Records – Study Area C

Historic Environment Records – Study Area D Part 1

Historic Environment Records – Study Area D Part 2

Historic Environment Records – Study Area D Part 3

Historic Environment Records – Study Area D Part 4

Historic Environment Records – Study Area E

Historic Environment Records – Study Area F

Historic Environment Records – Study Area G Part 1

Historic Environment Records – Study Area G Part 2

Landscape

Visual Baseline Tickenham Ridge to Avonmouth

Visual Baseline North Sandford to Tickenham Ridge

Visual Baseline Mendip Hills and Somerset Levels and Moors

Visual Baseline Bridgwater to Mark

Topography Plan Bridgwater to Mark

Topography Plan Mendip Hills and Somerset Levels and Moors

Topography Plan North Sandford to Tickenham Ridge

Topography Plan Tickenham Ridge to Avonmouth

Landscape Character Areas Tickenham Ridge to Avonmouth

Landscape Character Areas North Sandford to Tickenham Ridge

Landscape Character Areas Mendip Hills and Somerset Levels and Moors

Landscape Character Bridgwater to Mark

Socio economic

Socio-economic Features – All Study Areas

September 2011 – The preferred route corridor

Preferred Route Corridor

Hinkley Point C Connection Preferred Route Corridor map

Inset map 1: Hinkley Point Power Station, Bridgwater, Woolavington and Highbridge

Inset map 2: Mendip Hills AONB, Weston-super-Mare, Yatton, Congresbury and Nailsea

Inset map 3: Clevedon, Portishead, City of Bristol and Avonmouth

Stage 1A and 1B

Stage 1 route corridor study map
Hinkley Point C Connection route corridor study map showing the two route corridors consulted on during Stage 1.

Inset map 1: Hinkley Point Power Station, Bridgwater, Woolavington and Highbridge

Inset map 2: Mendip Hills AONB, Weston-super-Mare, Yatton, Congresbury and Nailsea

Inset map 3: Clevedon, Portishead, City of Bristol and Avonmouth

Stage 1 Consultation zone map
Hinkley Point C Connection project Stage 1 Consultation zone map.

Note: The new substation at Aust is no longer part of the project. Please visit the Q&As to find out why.